Went into Day Three feeling great about our progress and jumped right on the floor joists in the Laundry/Bath and Kitchen. Things went relatively smooth, albeit, the long joists in the Kitchen required some extra muscling, since the rest of the floor had settled so dramatically, but we made them work and will be happy with the floors once we get the sub-floors into place.
Next steps include building the walls and adding the pocket door for the middle bedroom and adding the pocket door for the bathroom, removing all trim and nails from existing studs and ceiling supports so that the drywall can be installed.
We also need to begin plumbing and wiring throughout the house. We'll be rewiring the entire house and running all new, Pex-a plumbing for water. Fun.
Next steps include building the walls and adding the pocket door for the middle bedroom and adding the pocket door for the bathroom, removing all trim and nails from existing studs and ceiling supports so that the drywall can be installed.
We also need to begin plumbing and wiring throughout the house. We'll be rewiring the entire house and running all new, Pex-a plumbing for water. Fun.