Three of Three

12/22/2014

0 Comments

 
Went into Day Three feeling great about our progress and jumped right on the floor joists in the Laundry/Bath and Kitchen. Things went relatively smooth, albeit, the long joists in the Kitchen required some extra muscling, since the rest of the floor had settled so dramatically, but we made them work and will be happy with the floors once we get the sub-floors into place.

Next steps include building the walls and adding the pocket door for the middle bedroom and adding the pocket door for the bathroom, removing all trim and nails from existing studs and ceiling supports so that the drywall can be installed.

We also need to begin plumbing and wiring throughout the house. We'll be rewiring the entire house and running all new, Pex-a plumbing for water.  Fun.
0 Comments



Leave a Reply.

    Archives

    March 2015
    January 2015
    December 2014

    Categories

    All

    RSS Feed

    View my profile on LinkedIn

      Contact Me.

    Submit
Powered by Create your own unique website with customizable templates.