Had a good first day and came into Day Two looking to finish the longest Sill and Ledger before starting the floor joist installation.
By the end of the day we had the Sill and Ledger and all of the studs replaced.
The temporary supports were removed without the structure letting out the least sign a stress.
By the end of the day we had the Sill and Ledger and all of the studs replaced.
The temporary supports were removed without the structure letting out the least sign a stress.